Ireland’s logistics and industrial sector presents strong growth opportunities, but developers may face planning, infrastructure, energy, regulatory and operational challenges. Rising occupier expectations must be balanced against higher development and financing costs. Key constraints include lengthy planning and grid connection timelines, increased power requirements for modern facilities, enhanced fire safety and ESG compliance standards, and pressure on transport infrastructure due to HGV driver shortages and road congestion. While Dublin remains the dominant logistics hub, rising costs are increasing the appeal of regional centres such as Cork, Limerick and the Midlands. Despite these challenges, demand for high-quality, sustainable logistics assets remains strong, and developers who successfully address regulatory, infrastructure and occupier requirements will be best positioned to capitalise on future market growth.
It is evident that there is a huge opportunity for growth and development in Ireland in the logistics parks and industrial units’ sector, yet several challenges persist. While occupier expectations continue to rise, developers must also consider regulatory, energy, infrastructural and planning concerns. This requires having systems which are dedicated to understanding growing occupier needs and external challenges whilst balancing costs, as due to higher interest rates and broader economic uncertainty some tenants do not want to lease technologically advanced property if they come at a major price point.
Planning:
From a planning point of view, it is well known that Ireland’s planning system is thorough but developers who engage early and collaboratively with local authorities can often navigate the entire process more efficiently, enhancing project outcomes and long-term acceptance. With regard to obtaining planning, once a valid planning application is lodged the planning authority has a statutory eight-week timeline to make a decision. Where a request for further information is made, it can push this timeline out as the local authority will have a further four weeks from the date the further information is submitted (applicant has up to six months to respond) to make a decision. Once a decision is made, if the decision is to grant the application, there is a four-week appeal window, after which if no appeal is lodged a final grant of planning will be issued. If a decision is appealed to An Coimisúin Pleanála, there is a statutory objective to make a determination within eighteen weeks.
The broader planning and infrastructure environment in Ireland presents further challenges. Infrastructure requirements, such as funding road upgrades, utilities, or power infrastructure, should be viewed as investments that not only support individual projects but also contribute to the wider community and improve asset value. In the current market, where higher interest rates and increased construction costs present challenges, there is a growing focus on delivering projects with secure, long-term income. This aligns with investor and lender preferences, and developers who can secure forward commitments from tenants are well positioned to access funding and deliver successful, resilient schemes
Electricity supply:
Modern logistics facilities, particularly those incorporating automation, AI, and high-density storage have substantial power requirements, and in Ireland this often necessitates the provision of a dedicated ESB Networks substation (ESB Networks, a semi-state body, are the licensed operator and owner of the electricity distribution and transmission assets across the Republic of Ireland) as part of the development. Developers may be required to allocate part of their site for the substation, construct it in line with ESB Networks specifications, secure a grid connection and subsequently transfer it to ESB Networks. This has elevated substations from a secondary consideration to a central component of early-stage planning, with implications for site layout, reduced development area, and increased upfront cost. Most critically, the timing of grid connections should be considered at a very early stage to allow for the additional time needed for their implementation to be incorporated into the wider development timelines. Applications over 200kVA, involving a substation can take at least 6 to 9 months from application to connection, whilst major business loads in excess of 4MVA, requiring a high voltage 110kV connection, can take over 2 years.
Fire safety:
As is being seen globally, the construction industry in Ireland is constantly evolving and adapting to modern requirements, particularly around environmental, safety and technology considerations The recent Building Control (Amendment) Regulations introduced on May 1st, 2025, require sprinkler systems for racked storage above seven metres alongside enhanced fire safety measures. The costs for these changes have increased build costs, which are typically passed through to occupiers/tenants via higher rents. Sustainability targets are becoming increasingly influential in shaping industrial development. Developers are now expected to deliver buildings that meet high ESG standards, including BER A ratings, reduced carbon footprints, and alignment with European frameworks. This drives the integration of rooftop solar PV, electric vehicle infrastructure, rainwater harvesting, and high-performance insulation systems. These features enhance long-term asset value and occupier appeal. Additionally, façade inspection and compliance requirements have become more stringent, particularly given the increased international scrutiny of building materials. Logistics units, which often rely on large cladding systems, must now incorporate certified non-combustible materials, cavity barriers, and fully documented installation methods. Developers must implement rigorous inspection regimes and may face additional certification requirements prior to tenant occupation.
Operational challenges:
Ireland is facing a structural shortage of HGV drivers. This issue is driven by an ageing workforce, high training costs, and long licensing timelines, and is already resulting in idle vehicles and constrained capacity. Given that Ireland’s freight system is heavily dependent on road transport, with limited alternatives, such as rail, this shortage is particularly impactful. At the same time, road infrastructure, especially around Dublin, is under significant pressure, with key routes such as the M50 operating at or near capacity. Congestion and delays reduce journey reliability, increase transport costs, and can weaken the attractiveness of otherwise well-located sites. As a result, developers must place greater emphasis on accessibility, proximity to major motorways, and overall operational efficiency when selecting sites.
Location, location, location:
Location dynamics further shape the development landscape. Dublin remains the dominant logistics hub, benefiting from its proximity to Dublin Port, which handles nearly half of the country’s trade, and Dublin Airport, the primary international gateway for air freight, as well as its large population and concentration of economic activity. However, rising rents and limited land availability in the capital are prompting both developers and occupiers to consider regional alternatives such as Cork and Limerick, as well as the Midlands, where improved connectivity via the M4, M6, and N4 motorways, combined with lower land costs and larger site availability, are enhancing their appeal. While there is a broader policy push toward regional development, including initiatives led by IDA Ireland, there remains no dedicated national policy specifically targeting logistics and industrial development outside Dublin.
Regulatory developments:
The revised Energy Performance of Buildings Directive bring long-term benefits. By driving higher energy performance standards, promoting renewable energy integration, and encouraging whole-life carbon assessments, the directive supports the delivery of more efficient, resilient, and future-proof buildings. These assets are more attractive to occupiers seeking to reduce operating costs and meet their own ESG targets, while also appealing to institutional investors focused on sustainable, compliant investments.
Ultimately, while occupiers continue to place growing demands on facilities, external challenges remain as an equally challenging hurdle for developers to adapt and overcome. Developers and investors who can respond to these demands and challenges in a way that drives sustainable profit will be best placed to capitalise on the next phase of growth in Ireland’s logistics market.